In 2010, construction and installation works on a hydroelectric power plant on the Andijan reservoir were completed and put into operation with a capacity of 50 MW. The commissioning of the Andijan HPP-2 at its design capacity allowed an increase in additional annual electricity generation in the region.
1969-1983 for a total of $350 million USA